Enclosed Acid Vapor Collector & Scrubbing Tower

Short Description:

1,All pretreatment tanks shall be built above the ground and inside pits. Build a fully enclosed pickling room to prevent acid mist outleakage causing corrosion to other equipment.

2,Enclosed room is fabricated with exterior steel structure and interior PVC crusting acid resistant board structure. Gaps between board and board are well sealed by glass cement. Acid resistant wood board are installed 2 meters below pickling room, installed with glass windows to observe. Ensure that there is always a slight negative pressure in the Pre-treatment area and prevent acid mist outleakage. two maintenance access installed on the top of pickling room.

3,Special Galvanizing electric hoists are installed on outside pickling room roof.

4,The operator working environment is always safe and clean.

5, Less outleakage, even if stop production during night and holiday can also avoid corroding equipment by pipeline acid outleakage.


Product Detail

Product Tags

Product Description

Acid vapors full enclosure collecting & Scrubbing tower2
Acid vapors full enclosure collecting & Scrubbing tower
Acid vapors full enclosure collecting & Scrubbing tower1

1,All pretreatment tanks shall be built above the ground and inside pits. Build a fully enclosed pickling room to prevent acid mist outleakage causing corrosion to other equipment.

2,Enclosed room is fabricated with exterior steel structure and interior PVC crusting acid resistant board structure. Gaps between board and board are well sealed by glass cement. Acid resistant wood board are installed 2 meters below pickling room, installed with glass windows to observe. Ensure that there is always a slight negative pressure in the Pre-treatment area and prevent acid mist outleakage. two maintenance access installed on the top of pickling room.

3,Special Galvanizing electric hoists are installed on outside pickling room roof.

4,The operator working environment is always safe and clean.

5, Less outleakage, even if stop production during night and holiday can also avoid corroding equipment by pipeline acid outleakage.

Product Details

  • 1. All tanks in the pre-treatment are placed and installed in the pits which are above the ground. Full enclosure is essential steel building, which prevent acid mist leakage outside, no any corrosive for other equipments outside.2. The full enclosure building is made of exterior steel structure and internal Pp crust corrosion resistant plate. The special material (eg. glass cement) are used among the panels to keep the good sealing property. Acid resistant wood board are installed at the 2m height position of lfull enclosure lower part, mount the window with glass to monitor, Ensure the pre-treatment processing in the micro negative pressure condition and prevent acid mist leakage outside. Two pcs maintenace gallery are installed on the top side of pre-treatment room.

    3. The monorial hoists which are used for galvanizing line are placed on the topside of sealed roof of pre-treatment room. Monorial hoists with special device can move and return direction through breaking rubber gap among the silicon sealing belts, it can prevent and alleviate the corrosion and readuce maintenance and examination of workload, so the maintenance cost will be save too much.

    4. The operators working environment is always in safe and clean condition.

Features

the contact surface of gas and liquid is more fully through filling material, thus improving the neutralization efficiency of pickling and making the purification efficiency higher.

Very low install power, Completely collecting efficiency ( under same capacity level)

PP pipe with small chance of damage, because It is impossible to be damaged.

Safe and no acid gas.

Running at low recoverable cost for all equipment in working area.


  • Previous:
  • Next:

  • Write your message here and send it to us